can anyone please help me understand the stacking commands
stack set slot 1 saved-slot 2
will this command set the slot no. to 1 from 2 or 2 to 1.
I have got confused after reading some alcatel documents.
The following scenario has confused me:
-> show stack topology
Link A Link A Link B Link B
NI Role State Saved Link A Remote Remote Link B Remote Remote
Slot State NI Port State NI Port
----+-----------+--------+------+-------+-------+-------+-------+-------+-------
4 IDLE RUNNING 4 UP 5 StackB UP 3 StackA
5 IDLE RUNNING 5 UP 1001 StackB UP 4 StackA
1001 PASS-THRU DUP-SLOT 2 UP 2 StackB UP 5 StackA
2 SECONDARY RUNNING 2 UP 1003 StackB UP 1001 StackA
1003 PASS-THRU DUP-SLOT 2 UP 1002 StackB UP 2 StackA
1002 PASS-THRU DUP-SLOT 2 UP 1 StackB UP 1003 StackA
1 PRIMARY RUNNING 1 UP 3 StackB UP 1002 StackA
3 IDLE RUNNING 3 UP 4 StackB UP 1 StackA
to correct the above thing the following commands were written:
-> stack set slot 4 saved-slot 1
-> stack set slot 5 saved-slot 2
-> stack set slot 1001 saved-slot 3
-> stack set slot 2 saved-slot 4
-> stack set slot 1003 saved-slot 5
-> stack set slot 1002 saved-slot 6
-> stack set slot 1 saved-slot 7
-> stack set slot 3 saved-slot 8
-> reload all
Are these commands right ?
stacking
-
KirkwoodCR
Re: stacking
Yes, you're good.
What the command does it take what the NI is showing and assigns it a number
1001 would mean the number on front is flashing and is not set as a stack
I would recommend a reload working no rollback-timeout instead of reload all
Then once it comes up, write memory flash-synchro
What the command does it take what the NI is showing and assigns it a number
1001 would mean the number on front is flashing and is not set as a stack
I would recommend a reload working no rollback-timeout instead of reload all
Then once it comes up, write memory flash-synchro
-
devnull
Re: stacking
After the first reload check that your config matches your physical switches (little is more error prone than having the built-in switches numbered 1,2,5,4,6,3)
Otherwise you are right.. if working and certified are identical reload all should do as well.
if it is only one switch to change a
"stack set slot 1001 saved slot 5 reload"
is fine. in your case your renumber everything so go ahead..
Otherwise you are right.. if working and certified are identical reload all should do as well.
if it is only one switch to change a
"stack set slot 1001 saved slot 5 reload"
is fine. in your case your renumber everything so go ahead..
Re: stacking
wrong subject. Please open the same in the OS6860 category.
regards
Silvio
regards
Silvio

