Spanning Tree Question
Posted: 13 Feb 2020 16:18
Hello,
I have two 6850 switches acting as cores (they are not in a stack); Core1 is uplinked to a Cisco Edge switch. I would like to have a failover so that if Core1 is unavailable, that Core2 will send traffic to the Cisco Edge switch; as the core switches are not in a stack though, I'm not sure how to make them aware of each other in a way that if port 1 on Core1 is up than port 1 on Core2 should be down and vice versa.
Is this possible?
Thanks.
I have two 6850 switches acting as cores (they are not in a stack); Core1 is uplinked to a Cisco Edge switch. I would like to have a failover so that if Core1 is unavailable, that Core2 will send traffic to the Cisco Edge switch; as the core switches are not in a stack though, I'm not sure how to make them aware of each other in a way that if port 1 on Core1 is up than port 1 on Core2 should be down and vice versa.
Is this possible?
Thanks.