We are planning an IP Centralization with 23 Nodes in the design.
The main site has a central area with 9 peripheral locations, and we wish to promote one of the peripheral locations to the new central area. Is there a way in Actis to promote an alternate shelf as the central area, demoting the existing central area as one of the peripherals?